Skip to content

CAUTION / LOCKOUT / TAGOUT REQUIRED / BEFORE SERVICING Lockout/Tagout Tag – 4" × 2" Black on Orange

Black on Orange

TB-RCT-40X20-BO-H-484942

$7.40 per unit

Engraved label reading "CAUTION / LOCKOUT / TAGOUT REQUIRED / BEFORE SERVICING", 4" × 2", black text on an orange background. Pre-drilled mounting holes.

Mount:

Shipping at checkout

= $7.40

Need a whole set? Send your list.

Spreadsheet, drawing, panel schedule or photo. We build every tag, price the set, and email a proof the same business day. Nothing is charged until you approve.

  • No minimum, no setup fee. One tag or a thousand.
  • Ships in 2–4 business days. Rush available at checkout.
  • Quantity pricing. The price per tag drops as the set grows.
  • Paying by PO? Net terms open after your first order, once your company details are on file. First order is by card.
Industrial Fast Ship USA Made

Description

Engraved label reading "CAUTION / LOCKOUT / TAGOUT REQUIRED / BEFORE SERVICING", 4" × 2", black text on an orange background. Use "LOCKOUT / TAGOUT REQUIRED" so servicing never starts without isolating energy.

For use on disconnects, control panels and production equipment that must be locked out for service.

This marking tells a worker to lock out and tag out the energy source before doing any service work. It is a reminder that the equipment must be made safe first.

Where it's used: Disconnects, control panels, motor starters, and production equipment where servicing means isolating power or other energy.

  • Wording: "CAUTION / LOCKOUT / TAGOUT REQUIRED / BEFORE SERVICING" (3 lines, bold lettering)
  • Size: 4" × 2" (102 × 51 mm), the most popular size for equipment, panel and door labels.
  • Color: Black text on an orange background. Black on orange is commonly used for warning-level markings and stands out on grey equipment.
  • Mounting: Pre-drilled holes in the corners for screws or rivets, for a permanent fix on panels, doors and equipment.
  • Material: 1/16" (1.6 mm) two-ply engraving plastic with a matte finish. The wording is engraved through the top color to the contrasting core, so it can't rub off like printed ink.
  • Corners: Square-cut corners and clean edges.

Put it next to the disconnect or isolation point so the reminder is where the lock actually goes. Usually ordered by maintenance supervisors and plant safety teams. Also called: lockout tagout label, LOTO caution label, lockout before servicing.

Want it to say something else, or in a different color or size? Customize opens this exact design so you can change it, and you can order one piece or a few hundred. Made to order in Waterford, Pennsylvania and shipped in 2–4 business days.